The most important finding was not in the numbers but in the assumptions behind them: the channel strategy depended on capabilities that would take longer to build than the plan allowed.
Our work was structured to be usable after the deal — the fact base became the baseline for the post-close value-creation plan.
Identifying details have been removed at the client's request.